FAQs
More FAQs- How long will it take to have my hard floors coated with urethane?
- When will I be able to walk on my floors?
- Will we always have the same cleaner?
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. The coating application can be accomplished at a rate of 750 square feet per hour with a two-person crew.
Hard-surface floors treated with an acrylic finish can be lightly walked on within an hour after the last coat was applied. We recommend allowing the floor to dry for 24 hours before allowing heavy traffic on it.
We strive to maintain continuity as this helps build a healthy rapport and trust with our janitorial services customers along with added security.